6-week sprint β€’ Engagements start at $10,000 β€’ Limited capacity per quarter

Build Your MVP With Senior Engineers

Go from concept to production-ready MVP in 6 weeks β€” built for rapid iteration and future scale.

Built to survive real scale

No rewrite after funding

We're not another dev agency. We build MVPs with the same standards as scalable production systems β€” architecture designed for growth, observability from day one, and code you won't need to rewrite when real users arrive.

Most MVPs are built on shaky foundations.

Speed matters β€” but so does doing it right the first time.

A production-ready MVP built to evolve.

Built with production standards

Technologies and practices that prevent rewrites

Scalable architecture

Designed to grow. Relational databases, robust backend, and modular structure from day one.

Built-in observability

Structured logging, error monitoring, and usage metrics configured β€” you know what's happening in production.

Production deployment

CI/CD, environment variables, staging and production β€” ready to scale without post-launch configuration.

Real metrics

Key event tracking, active users, and behavior data β€” real insights to iterate with confidence.

Stack we use: Next.js, Rails, Flutter, React Native, Expo, Swift, Kotlin, Vercel, Railway, Render β€” chosen based on your product.

  • Next.js
  • Ruby on Rails
  • Flutter
  • React Native
  • Expo
  • Swift
  • Kotlin
  • Vercel
  • Railway
  • Render

What we do in 6 weeks

  1. Define

    We run a scope definition workshop to understand your product vision, users, and core features.

  2. Build

    We design scalable architecture and build your MVP with clean, maintainable code.

  3. Launch

    We deploy to production, set up basic metrics, and provide 2 weeks of post-launch support.

What's included

Why Fixe

Fixe is senior-led engineering. We build MVPs the same way we build production systems β€” with clarity, discipline, and technical rigor.

Investment

Engagements start at $10,000. Final scope is confirmed after an initial workshop to ensure clear deliverables and realistic timelines.

Ready to build your MVP the right way?

Contact

Let’s align on the next step

Tell us what you need to build or stabilize and where things stand today.

MVP Build Sprint | Fixe β€” Build Production-Ready MVPs Fast